top of page

The CLT Panels Arrive in Barra

jo1166


After a somewhat anxious wait, the CLT panels have arrived in Barra from Austria. It's thrilling to watch them being unloaded into the factory. These panels will form the complete structure for the new building. We will be traveling to Barra at the end of the month to see all the work the Modular West team has been doing. Stay tuned!




 
 
 

Recent Posts

See All

Stage 1 Foundations

Things are becoming quite tangible onsite now, with the initial stage of the foundations completed and the roadway relocated. Tractar and...

Комментарии


© Macaulay College CIC, Company No: SC380232

01851 700987 | 07754 364519

info@macaulaycollege.com

Macaulay Farm, Lochs Road, Isle of Lewis, HS2 9JN

Accessible Toilet open 

Mon - Fri

9 - 3.15

01851 700987

For more info see Our Spaces

  • Facebook
  • Instagram

Macaulay College is committed to Fair Work First Principles including paying the real living wage, supporting an inclusive workplace and engaging transparently with our staff and community.  Macaulay College operates open channels of communication providing effective voice individually and collectively.

bottom of page