
After a somewhat anxious wait, the CLT panels have arrived in Barra from Austria. It's thrilling to watch them being unloaded into the factory. These panels will form the complete structure for the new building. We will be traveling to Barra at the end of the month to see all the work the Modular West team has been doing. Stay tuned!
Комментарии